Wednesday, December 27, 2006
Wednesday, December 06, 2006
CISC tour leaves now...
![](http://photos1.blogger.com/x/blogger/5145/3089/200/242938/IMG_8896_JPG.jpg)
![](http://photos1.blogger.com/x/blogger/5145/3089/200/471921/IMG_8897_JPG.jpg)
![](http://photos1.blogger.com/x/blogger/5145/3089/200/16112/IMG_8895_JPG.jpg)
![](http://photos1.blogger.com/x/blogger/5145/3089/200/866469/IMG_8891_JPG.jpg)
![](http://photos1.blogger.com/x/blogger/5145/3089/200/1707/IMG_8886_JPG.jpg)
![](http://photos1.blogger.com/x/blogger/5145/3089/200/930004/IMG_8887_JPG.jpg)
Update #96
![](http://photos1.blogger.com/x/blogger/5145/3089/200/672727/DSCF0001.jpg)
![](http://photos1.blogger.com/x/blogger/5145/3089/200/638642/DSCF0002.jpg)
![](http://photos1.blogger.com/x/blogger/5145/3089/200/751129/DSCF0001.jpg)
We're still working on the Family Center, Sunshine Garden and the computer center. Our plan is to move them in on Tuesday, December 19, just in time for the holidays.
We'll keep you posted!
Thursday, November 16, 2006
Cleaning Up
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0267.jpg)
The cleaners are doing a good job on the furniture and the
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0272.jpg)
Now we're preparing for al
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0268.jpg)
611 S Lane St!
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0265.jpg)
Months ago, we were told that we should choose an odd number between 601 and 619 since Cathay Bank is 621 S Lane. So we picked 611 and assumed all was well until about 3 weeks ago.
Turns out that the way the city numbers things is based on where the walkway comes out of the building. So even though we're facing Lane St, and the bank right next to us has a Lane St address, we were told we had to have a Maynard Ave address!
After much consulting with the city and working with their supervisors, they decided to let us go with 611 S Lane. Good thing too, since the movers are coming tomorrow. It's been kind of difficult taking deliveries when no one can find us.
Even ended up having to stand out on the corner in the rain last week to direct a delivery truck to our site! To make it even more confusing, the original address of the building was 624 S Dearborn, but on all the permits it was incorrectly listed as 628 S Dearborn.
Monday, November 13, 2006
More Pics
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0260.jpg)
After cleaning the surface, they poured more concrete so that the water won't run into the building when it rains. And our seniors won't trip as they exit the building!
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0261.jpg)
Final Touches
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0258.jpg)
We plan to close down Thursday, the 16th to allow staff to pack up their final belongings. Friday, first thing bright and early, the movers will be on site to move everything over. Luckily it's only 3 blocks, so we won't have to contend with much traffic - we hope!
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0257.jpg)
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0259.jpg)
Monday the 20th is set aside for staff to unpack their belongings and we'll be back in business on Tuesday the 21st. Just in time for Thanksgiving!
Thursday, November 02, 2006
Wall Panels
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0164.jpg)
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0132.0.jpg)
These movable walls provide great flexiblity in how we are able to use our space in the Family Center. Whether they're all closed so we have 5 separate rooms for meetings and classes, or all open so we have one large gathering space for community events, these panels allow for multiple uses and many different configurations.
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0252.jpg)
Elevator
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0256.1.jpg)
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0187.jpg)
Tuesday, October 31, 2006
Front Doors
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0248.1.jpg)
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0247.3.jpg)
The glass for all the interior spaces is also on site. They'll be going into all the private offices and in the conference room which has 3 walls with floor to ceiling glass. Talk about a fish bowl!
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0249.jpg)
Thursday, October 26, 2006
Teal, huh?
![](http://photos1.blogger.com/blogger/5145/3089/200/DSCF0015.jpg)
![](http://photos1.blogger.com/blogger/5145/3089/200/DSCF0016.jpg)
The furniture installers are working hard to get all the cubicles put together
![](http://photos1.blogger.com/blogger/5145/3089/200/DSCF0017.jpg)
Finally, we've chosen our lighting fixtures for the raised roof area and entrance lobby. They look like this, but will not actually be installed for another couple of months because they're backlogged.
![](http://photos1.blogger.com/blogger/5145/3089/200/200669133952_QED-II-Pendant-single.jpg)
Tuesday, October 24, 2006
New Reception Area
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0111.0.jpg)
![](http://photos1.blogger.com/blogger/5145/3089/200/DSCF00051.jpg)
In our new building, our reception area is about FOUR TIMES bigger. It has natural light from a window looking out onto the skyscrapers of downtown Seattle, a reception desk that will have safety glass for security and a lower counter
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0239.jpg)
We've also got a place for a flat screen TV that we will be running videos on for people to watch (and learn) while waiting. Videos on
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0175.jpg)
Monday, October 23, 2006
Furniture Installation
![](http://photos1.blogger.com/blogger/5145/3089/200/DSCF0001.2.jpg)
So how do we move it? With a forklift, and VERY gently, of course! They've already finished all the framing for the relites on the 2nd floor, but left this one section open for the forklift. Fortunately, the glass is not in yet, but as far as we know, they didn't even bump the frame once!
![](http://photos1.blogger.com/blogger/5145/3089/200/DSCF0006.jpg)
The carpet is all done, and here you can see one of the managers' desks in their office. They are so long (96 inches!) that in order to get them onto the forklift, they had to first attach 2 ten foot long pieces of wood so the desks wouldn't fall off the front!
![](http://photos1.blogger.com/blogger/5145/3089/200/DSCF0004.1.jpg)
Friday, October 20, 2006
Movable Stairs - Just Like in Harry Potter!
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0071.jpg)
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0210.7.jpg)
Then one day last week, they ended up sideways in the lobby for some reason.
And now they're back against the wall today as they bring in the steel for the final set of stairs! These new stairs will have oak treads with clear plexiglass risers and teal steel railings.
Thursday, October 19, 2006
Hurry Up and Stop!
![](http://photos1.blogger.com/blogger/5145/3089/200/DSCF0007.jpg)
We are told that the final inspection of the building cannot happen sooner than 10 days after all the other inspections have been done and signed off on. The plan was to have all these inspections done by the 27th. Normally, we could have gotten a final inspection that same day, or the next, but the city's building department is really backed up and needs 2 weeks time.
Anyway, the new plan is for us to close from Thursday, Nov 16 through Monday, Nov 20, and reopen for business on the 21st, just before Thanksgiving. It can't be helped, but we're trying to keep a positive attitude and stay flexible.
Monday, October 16, 2006
Getting There
![](http://photos1.blogger.com/blogger/5145/3089/200/DSCF0001.0.jpg)
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0188.jpg)
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0223_JPG.jpg)
But th
![](http://photos1.blogger.com/blogger/5145/3089/200/DSCF0004.jpg)
Friday, October 13, 2006
Wide Load
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0229.jpg)
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0219.jpg)
So all they have to do is get the units in place, bolt them down and connect. We're ready to go!
![](http://photos1.blogger.com/blogger/5145/3089/200/IMG_0221.1.jpg)
Subscribe to:
Posts (Atom)